Campbell Learning Resources Center projects will include:

  • Improvement of accessibility from first-floor elevator to other floors; currently one must access the elevator externally through the loading dock, as access is barred by the circulation desk and a security door. This is a major issue for those with physical disabilities.
  • Renovation of the Little Theater.
  • Adding of student study rooms.
  • Renovation of the second floor to improve the learning environment.
  • Renovation of the basement.
  • Waterproofing and louver replacement in the basement.
  • Replacement of exterior sealants (joints and penetrations).       
  • Retrofitting door hardware to meet Americans with Disabilities Act standards.
  • Installation of a fire sprinkler system.
  • Coating of interior of existing galvanized domestic cold water piping.
  • Installation of an emergency lighting generator.
  • Replacement of/upgrades to network electronics.
  • Replacement of/upgrades to classroom technology.
  • Replacement of/upgrades to wireless network.
  • Performance of fiber optic loop redundancy work.

 

 
Campbell Learning Resource Center

 



 

Main Campus: 1555 S. Raisinville Rd. | Monroe, MI 48161 | 734.242.7300
  
Whitman Center: 7777 Lewis Avenue | Temperance, MI 48182 | 734.847.0559


Contact Us
 | Site Map |  Affirmative Action (EOE) Statement

© Monroe County Community College

MCCC Home Page